switch staging

June 23, 2017

NETWORKING

Staging and Setup for Cisco Live 17

3 min read

The average IT refresh cycle for access layer switches is typically anywhere between 5 to 8 years. This means the typical engineer configures a switch once, and then, other than minor changes, doesn’t have to reconfigure that switch again for a long time. The rollout process also tends to be staggered over time and location, […]